New GMHS SD Drawings

Sunday Series - November 18, 2018
Posted on 11/19/2018

Below are schematic drawings for the new George Mason High School.  These were reviewed in depth during the Sunday Series Public Forum at the Falls Church Community Center - Sunday, November 18, at 2:00 p.m.

Presentation Slides


DOWNLOAD SD DRAWINGS

Current Ground Level Design

Current Gym Level Design

Current First Level Design

Current Second Level Design

Current Third Level Design

Current Fourth Level Design

Current Fifth Level Design

Website by SchoolMessenger Presence. © 2018 West Corporation. All rights reserved.